2018 City-Wide Asphalt Restoration P1801

Location:   (See below)

Cost:          $ 1,617,239.80

Status:       Project is complete

Project Description

The contractor for this project was Central Washington Asphalt. This project improved a portion of the following streets: Columbia Center Blvd. (W. Quinault Ave. to SR240 ROW), S. Washington Street (E. 10th Ave. to E. 19th Ave.), and S. Quillan Street (W. 27th Ave. to W. 28th Ave.). There was also work on portions of Keywaydin Drive and the parking lot of Fire Station #4 located at 2620 W. 27th Avenue.

Work also included the lowering of existing utilities, planing (grinding) as called for on the plans, patching of miscellaneous failed areas, minor sewer line replacement, overlaying, pavement lane striping, cross walks, stop bars, signage, traffic control, pavement markings and other work.

Status

Project is complete.