Zone 3 West Transmission Main

Project Description

The project will extend a 20-inch water transmission main from a dedicated pumping station at 18th & Kellogg Reservoir site to the Zone 3 Kansas Reservoir, located south of the Hansen Park development.

Important Dates

Start Date:
Fall 2020
Estimated End Date:
Summer 2021
Location:
18th & Kellogg
Estimated Cost:
$4.4 million


Status

In design.

Last updated 6/18/2019