Ohrts Subdivision Storm Drain System

Project Description

This project will alleviate localized frequent flooding in the Orht's Addition Subdivision by installing a storm drain system to connect individual failing drywells to the Vancouver Street storm drain system. This will eliminate the need to monitor and collect surface stormwater during large stormwater events, saving staff and equipment time. It will also eliminate the potential flooding of nearby homes, and the damage to the streets from a wet subgrade.


Ohrts Storm Drain Map

More Info

Start Date:
2021
Est. End Date:
TBD
Funding Source:
General Storm fund


Status

Design and construction in 2021.

Last updated 10/26/2020